Factory Construction: Process, Permits, Costs, and Standards

Building your own factory is a suitable option for businesses with long-term, large-scale projects or specific technical requirements that pre-built factories cannot meet. However, this requires the business to go through a series of procedures and manage a real construction project.

This article outlines the factory construction process from preparation to acceptance, the procedures for obtaining construction permits, the cost components, and the technical standards that businesses need to pay special attention to.

When should a business build its own factory?

The first case involves projects with specific technical requirements. These may include very high floor loads, above-standard clear heights, crane systems, or cleanroom facilities. In such cases, renovating an existing factory may not be feasible or cost-effective. Therefore, Factory Construction can provide greater control over the required specifications.

The second case involves large-scale, long-term projects. When a project requires a large area and may operate for several decades, total rental costs can exceed the cost of construction. As a result, building a factory may offer a more financially viable option.

The third case involves businesses that want greater control over their assets. Owning a building on leased land allows the business to renovate and expand the facility more proactively. In addition, the building may create asset value for future financing or transfer.

Vinasc helps clients evaluate these options from both financial and tax perspectives. We compare total lifecycle costs, assess the impact of depreciation on business results, and review the documentation required to recognize investment costs in accordance with regulations.

Factory Construction: Process, Permits, Costs, and Standards
Factory Construction: Process, Permits, Costs, and Standards

1. Factory construction process

The first phase is investment preparation. The business identifies its production needs, selects a suitable location, and signs a land lease agreement. It then prepares the feasibility study or project proposal. At this stage, the business also completes the required investment and environmental procedures.

The second phase covers design and permitting. The business prepares the basic and technical designs. It then reviews the designs against applicable regulations. Next, the business applies for a construction permit and completes the fire safety design approval dossier.

The third phase involves construction and acceptance. The business selects contractors and signs construction contracts. It then supervises construction quality and progress. In addition, the business accepts completed work items and tests the fire safety systems. Finally, it completes the acceptance procedures for the entire project before commissioning.

After completion, the business prepares the final construction documents and completes the procedures for asset registration. At this stage, the accounting department records the factory as a fixed asset and determines the applicable depreciation period.

2. Factory construction permit

A building permit application typically includes an application form and documents proving land use rights. It also includes approved design drawings and relevant fire safety approval documents when the project requires them.

Some construction projects within industrial parks may qualify for a permit exemption. This can apply when the project already has an approved detailed plan. However, businesses must still complete the required design, approval, and construction commencement notification procedures.

The authority responsible for issuing permits depends on the type and location of the construction. For projects within industrial zones, the industrial zone management board is often the main point of contact. As a result, the process may be more straightforward than for projects outside industrial zones.

Starting construction without a required permit can lead to administrative penalties. Authorities may also require the business to stop construction. Therefore, businesses should confirm the permit requirements before starting work to avoid disrupting the entire project.

3. Factory construction costs

The largest component is the cost of constructing the structural framework: foundations, footings, steel frames, roofs, and perimeter walls. This cost depends on the area, span, height, and especially the required floor load.

The second category is technical systems: power, lighting, water supply and drainage, fire protection, ventilation, and air conditioning. In some industries, technical systems alone account for a significant portion of total costs.

The third item is consulting and procedural costs: design, verification, supervision, various fees and charges, and contingency costs for unforeseen expenses during construction. Businesses should allocate a reasonable contingency fund instead of creating a tight budget.

  • Costs for constructing the structural framework and framework.
  • Electrical, water, fire protection, and ventilation systems.
  • Costs for design consulting, verification, and supervision.
  • Various fees, charges, and contingency costs may arise.

4. Standards to consider when constructing a factory.

Structural and load-bearing standards must be based on the actual requirements of the production line, taking into account the possibility of future machinery upgrades. Designs that closely match current needs often lead to significant renovation costs later on.

Fire safety standards are mandatory and subject to strict inspection. Designs must be approved before construction begins, and buildings must undergo fire safety inspections before being put into use.

Environmental and occupational safety standards should also be considered from the design stage: wastewater and exhaust gas collection and treatment systems, escape route arrangements, and hazardous waste storage areas, if any.

From an accounting perspective, businesses need to keep complete records of construction contracts, acceptance documents, invoices, and payment vouchers for each item. This set of documents serves as the basis for recording the original cost of fixed assets and deducting input value-added tax.

🔗 See the in-depth article:

  • Factory and Warehouse Rental Services for Manufacturing Businesses and FDI Companies

Work process at Vinasc

Vinasc operates according to a fixed and transparent process: emails reminding applicants to prepare documents are sent between the 20th and 25th of each month, followed by an email requesting documents at the beginning of the following month. Documents are processed based on received information, further communication is held if anything is missing, and finally, a confirmation email is sent to the customer before proceeding to the next step.

With email-based communication, all exchanged information is fully archived, allowing businesses to proactively monitor and control data without relying on a single individual.

Why do businesses choose Vinasc?

  • Comply with the law and keep commitments regarding progress and quality.
  • Receive free updates on policy changes that may affect customers.
  • Our team of nearly 50 specialists provides multilingual support, making it convenient for foreign investors.
  • All communications are tracked via email, allowing businesses to retrieve them at any time.
  • A single point of contact throughout the entire process, ensuring customers don’t have to explain things from scratch.

Close coordination between businesses and Vinasc is essential for maintaining work quality and meeting deadlines. Providing complete documents on time also helps ensure smooth progress.

In addition, Vinasc’s customers receive free updates by email and Zalo OA whenever relevant policies or laws change. These updates help businesses stay informed, comply proactively, and reduce potential risks.

Ultimately, the business owner, legal representative, and director remain responsible for legal compliance. Therefore, working with an experienced consulting firm can help businesses identify and manage potential risks more effectively.

Businesses should also note that they remain responsible for archiving their records and documents under applicable regulations. The service provider only collects documents for processing unless both parties have a separate agreement covering document storage.

Finally, every business has different characteristics in terms of industry, size, and operating model. For this reason, Vinasc does not apply a single solution to every client. We first understand the business’s actual operations. We then propose a suitable solution that supports compliance while remaining practical for the company’s available resources.

Frequently Asked Questions

Is a building permit required for constructing a factory in an industrial park? It depends on the case. Construction within an industrial park that already has an approved detailed plan may be exempt from permits, but design review and notification of commencement of construction are still required.

How long does it take to build a factory? Depending on the scale and complexity, it usually takes from a few months to over a year, including paperwork. Businesses need to factor this time into their production and business plans.

How are factory construction costs accounted for? They are included in the work-in-progress construction costs, and after completion and acceptance, they are transferred to the original cost of fixed assets and depreciated over the estimated useful life.

Can a factory built on leased land be recognized as an asset? Yes. Construction projects undertaken by businesses on leased land are recognized as fixed assets of the business, with depreciation typically tied to the remaining lease term.

What support does Vinasc provide in factory construction projects? Vinasc provides financial and tax consulting: controlling investment documents, recording fixed assets, determining depreciation periods, and ensuring eligibility for input value-added tax deductions for the project.

Conclude

In summary, factory construction needs to be taken seriously, as seemingly minor mistakes can lead to legal risks and additional costs later on. The difference between a smoothly operating business and one that frequently encounters problems often lies in the quality of the initial preparation and consultation.

As Vinasc Accounting and Tax Consulting Company Limited with 15 years of experience, we are committed to supporting businesses in factory construction with transparent, compliant services and upholding our commitments regarding progress and quality. Let Vinasc be your partner, making every step of compliance smoother and more secure.

Contact us for consultation.

If your business needs assistance with factory construction, the Vinasc team is always ready to provide advice — quickly, legally, and with dedication.

Contact — Vinasc Accounting and Tax Consulting Company Limited:

  • Hotline: 0947 112 118 or 0971 112 118
  • Email: Vinasc.hcm@gmail.com
  • Website: https://vinasc.vn
  • Zalo OA: https://zalo.me/1108220964917000230